Capped at 90% of the electricity consumption from the date of connection (to the grid) to the end of the financial year. No carry forward to the next financial year.
5
Interconnection point
Up to 5 Kw – Single phase at 230 V
5 kW and above up to 50 kW / 63 kVA 3 Phase, 4 wire at 415 V
A general customer awareness compilation by SolarSmiths. For any concerns, comments or suggestions regarding the contents of this document, please feel free to contact us at info@solarsmiths.com or +91 95994 66291
Disclaimer
The information contained in this document is based on policies, notifications, facts and figures as avaiable from MNRE, SNA, ERC’s from time to time. Although the information provided in this document is believed to be accurate as of the time of preparation, SolarSmiths cannot be held liable for its accuracy and correctness. This report is not intended to provide investment advice, and any citing of resources, references and organizations should be not interpreted as an endorsement. For most up to date information visit www.solarsmiths.com.