NewDelhi
NewDelhi
Sonipat
Faridabad
Gurgaon
Bahadurgarh
+91 98703 93898 Mon - Sat 10:00 - 18:00 K-64, Udyog Nagar, Rohtak Road, New Delhi-110041
+91 98703 93895 Mon - Sat 10:00 - 18:00 1392, Rai Industrial Area, Sonipat, Haryana
+91 98703 93896 Mon - Sat 10:00 - 18:00 Mohan Cooperative, Mathura Road, New Delhi
+91 98703 93894 Mon - Sat 10:00 - 18:00 MG Road, Gurgaon, Haryana
+91 98703 93897 Mon - Sat 10:00 - 18:00 277, HSIIDC Industrial Estate, Sector-17, Bahadurgarh
Protect & Care
Ceritified
ISO 9001:2008
The Best
in North India
Number #1
Installer in the region
Schedule a visit

BBMB Jagadhri

BBMB Substation Jagadhri engaged with SolarSmiths Energy Private Limited to develop their solar photovoltaic system under the PowerSmith Series.

Project Description

The Bhakra Beas Management Board (BBMB) is the third-largest hydropower capacity in India. It is an organization created with the motive to serve the nation and is engaged in regulating the supply of Water & Power from Bhakra Nangal and Beas Projects to the states of Haryana, Delhi, Punjab, Rajasthan, Himachal Pradesh, and Chandigarh. BBMB maintains the major water reservoirs in the country, such as Bhakra and Pong Dam reservoirs, and operates a 98 Km long water guide system including channels & tunnels.

BBMB Substation Jagadhri engaged with SolarSmiths Energy Private Limited to develop their solar photovoltaic system under the PowerSmith Series. The project is comprised of a 70 KWp net-metered distributed generation solar power system.

Apart from various challenges and obstacles, the Solar Smiths expertise team has successfully completed the project, and the plant is now generating the efficient energy required for its operation.

BBMB.png
CustomerBBMB Jagadhri
LocationHaryana
Plant Capacity70 kWp
Solution PowerSmith Series
Installation TypeIndustrial

Get Free Solar Consultation today!

    Project Benefits

    • Within the limited area, the team successfully systematically generated the solar plant system.

     

    • The project is being successfully installed with its unique flush mount structure and with proper design engineering.

     

    • Reduction of heat in the building due to the open area; the installation of panels on the rooftop helped reduce the energy required for cooling the building.

     

    • BBMB control room building now cut down approximately 33 percent of its electricity usage with the solar plant, saving around Rs. 5 Lakh per annum and practically Rs. 1 Cr when calculated for the next 25 years.

     

    • In addition to generating 89,425kWh, the solar photovoltaic system also reduces the Carbon reduction of 70,288Tonnes
    Annual Yield
    88000 kWh
    Annual electricity units generated in a Year
    Monetary Savings
    Rs.792000
    Money saved in the form of electricity bill reduction in a Year
    Co2 Reduction
    65000
    Tonnes of Co2 abated from the environment in a Year
    Trees Planted
    400
    Number of trees added to the environment in a Year
    Water Saved
    265000
    Litres of water saved by going solar in a Year

    “With Thorough, Instant and Reliable solar setup, our 70KWp project helps in reducing our electricity bills outstandingly. We also like to appreciate the SolarSmiths Energy Pvt. Ltd. team for their professionalism and thank them for completing this project within the time limit.”

    BBMB Jagadhri
    Management